Hellmann Worldwide Logistics is partnering with Exotec to automate storage, order fulfillment and the movement of materials at Siemens Smart Infrastructure Buildings’ Nuremberg site. The partnership is expected to create additional capacity to support the site’s anticipated growth while improving efficiency, quality and space utilisation.
Hellmann has operated the warehouse at the Nuremberg site as a full-service logistics provider for Siemens Smart Infrastructure Buildings since 2025. The new robotics system is scheduled to go live in mid-2027, a timing intended to support future growth and expected annual increases in volumes.
Autonomous robots and scalable storage
Under the plan, autonomous robots will store and retrieve goods and transport totes to picking stations. The system will initially offer around 35,000 storage locations and is designed to scale as demand increases. Storage capacity and picking stations can be added flexibly and with minimal effort, according to the announcement.
The automation is focused on storage, order fulfillment and internal material movement within the facility. The planned system is intended to add capacity without removing operational flexibility: the initial storage footprint can be expanded, and additional picking stations can be introduced as volumes rise.
Daniel Schnuck, director of global warehouse at Siemens Smart Infrastructure, said the new automation solution at the Nuremberg site creates a foundation to support future growth, continuously improve operations and ensure a consistently flexible and high level of service for customers over the long term.
Smart-building energy management
Siemens Smart Infrastructure Buildings can dynamically manage their own energy demand and generation. This is achieved through a bi-directional energy flow between on-site generation and storage systems and the outside electrical grid. A smart building can therefore manage energy supply and demand to help eliminate energy waste and reduce greenhouse gas emissions.
The Nuremberg project places the warehouse automation alongside this smart-building capability. The logistics system is described as a way to support growth at the site, while the building’s energy systems are designed to manage supply and demand through on-site generation, storage and grid interaction.
The planned system is positioned as a flexible response to volume growth rather than a fixed-capacity installation. With the initial 35,000 storage locations and the ability to add storage and picking stations, the design is intended to let the warehouse accommodate anticipated annual increases in volumes after the mid-2027 go-live.
The announcement describes a planned deployment rather than an operating system. It also frames the automation as part of the site’s ability to support future growth, with the initial storage capacity able to expand as demand requires.
